The provisional acceptance of Sabiha Gökçen Airport Cogeneration System Supply and Installation Project under HEAŞ, which is affiliated to the Defense Industry Presidency, has been made as a result of the system passing the tests successfully.          


 
Within the scope of this project, natural gas line displacement and hot-tap connection, cogeneration service building with 1500 m2 closed area and cogeneration system working with 2.5 MW capacity have been complated and all of its licences were made. The plant is currently actively used and generates energy at maximum efficiency.